Some progress thanks to Matt d, Matt g, woody, Mitch, Timmy b, Benny, thestu and sneaky. Driveway looked good with 7 dubs at once.
Few suprises like driveshafts held in with only 1 tight bolt and two lose bolts, subframe bolts rusted in, 1 cam skipped a tooth and the other cam skipped two.
So far Vr was stripped and is now fitted with 2lt beam and 2lt subframe to make it moveable, engine is degreased (soooo much mess) and appart ready for new head, chains, gaskets etc.
Vr beam is in the Vento.
H
Bookmarks