You need to cut 5mm off the Mk2 dash in a straight line along the leading edge.
Basically you are turning the curve into a straighter edge along the middle 2 thirds of the distance. About a couple of inches outside the two bolts is the extreme edges of the cut.
Then drill 2 holes in your Mk1 and fit the bolts through the bulkhead.
Thats it, squash the sides in so it fits and leave the doors shut for a couple of days to mould to shape.
.
Good luck hooking up the blower and heater tubes
Bookmarks