Support VWWC

Page 77 of 238 FirstFirst ... 2767757677787987127177 ... LastLast
Results 761 to 770 of 2377

Thread: How to track the car you have ordered?

  1. #761
    Join Date
    Nov 2009
    Location
    Melbourne
    Posts
    1,684

    Quote Originally Posted by Prodigy View Post
    Unfortunately you won't get the VIN & Engine numbers until the car is physically built and has left the assembly line.
    Not exactly, I think they're available as soon as the build is allocated a production slot. The Polo hasn't been built yet but we got the details about 2 weeks ago. Don't have the info in front of me, can confirm later.

  2. #762
    Join Date
    Aug 2010
    Location
    Sydney Northern Beaches
    Posts
    122
    Users Country Flag
    Quote Originally Posted by dave- View Post
    Not exactly, I think they're available as soon as the build is allocated a production slot. The Polo hasn't been built yet but we got the details about 2 weeks ago. Don't have the info in front of me, can confirm later.
    So when do you reckon I should hassle the dealer, I dont want to be unrealistic but would really like to track my car.

  3. #763
    Join Date
    Mar 2010
    Location
    Camberwell
    Posts
    96
    Quote Originally Posted by ozmale View Post
    So when do you reckon I should hassle the dealer, I dont want to be unrealistic but would really like to track my car.
    Did salesperson advised you on your ETA for your car?
    What car is it?

  4. #764
    Join Date
    Aug 2010
    Location
    Sydney Northern Beaches
    Posts
    122
    Users Country Flag
    Quote Originally Posted by Serge View Post
    Did salesperson advised you on your ETA for your car?
    What car is it?
    It is a Golf "R" 5 door DSG in White.
    The car was ordered on 11/8/2010. The estimated delivery date on the order is 25/12/2010 which I suspect is just plucked out of the air as the last date before the new year.

  5. #765
    Join Date
    Nov 2007
    Location
    Cairns, Queensland
    Posts
    182
    That sounds about right, I'm in for a week 42 build...Ordered my 3 door R on 3rd August and delivery mid December - Early January at the latest
    2007 Golf GT Sport TDi sold!
    2011 Golf R 3 door Candy White with all the non carbon fibre fruit !
    2011 Tiguan 147TSI

  6. #766
    Join Date
    Feb 2009
    Location
    Sydney, Australia
    Posts
    8,362
    Users Country Flag
    Quote Originally Posted by ozmale View Post
    So when do you reckon I should hassle the dealer, I dont want to be unrealistic but would really like to track my car.
    Keep in mind that the VIN is only good for tracking the car during shipping. The only way you can track the car before it shipping is by asking your dealer to provide a screenshot or printout of the NADCON ETA Data. Once you have an understanding of an allocated build week (which as Prodigy has stated, for most of us is week 37 to around 40, but recent orders have missed those weeks and are yet to have allocated dates as far as we're aware), you can then estimate when the car will be received.

    For example.
    My order for the R was placed June 12th (Week 22). The ETA for delivery given by my dealer at that point (which is PURELY a guestimate based on existing orders they had in the system and "past experience" was November 30th.
    It wasn't until a month later that my dealer was then aware that it had a "planned production week" of Week 38 (September 13 to 19). This means that I will probably receive my VIN sometime in September (since customers (dealers?) are not always lucky enough to receive it before it enters production, such as dave- has!)

    My latest update of the NADCON ETA table is that "Handover to Production" is 11/09/10, and "Arrival at Final Destination" is 2/12/10. "Final Destination" is not me nor the dealer btw. So hopefully the shipping is quite zippy and I still end up getting it on November 30th, but really, I'll just be happy to receive the car before Christmas.

    As I mentioned before, so far we (at the forums) have had no indication at what the next "Build Weeks" that Australian R orders will go into after the batch planned for week 37 to 40, which is apparently already full. So even if they do another batch in week 45 (November 1st to 7th), this would mean you wouldn't receive your VIN until ~November, and would not receive your car until late January, more likely February.


    Edit: Whilst writing that a few peeps have posted.
    Angryman - you're the first person I've seen indicate a Week 42 build. Has your NADCON ETA table been updated to indicate a "Handover to production" between Oct 11 to 17 yet?
    ozmale & Angryman - given the latest update to my ETA data (detailed above), and Dermot's post here based on the information his dealership can see, I would highly recommend you guys DO NOT plan/hope to see your car in December
    Last edited by Corey_R; 18-08-2010 at 07:16 PM.

  7. #767
    Join Date
    Aug 2010
    Location
    Sydney Northern Beaches
    Posts
    122
    Users Country Flag
    Coreying,

    thanks heaps for the detailed response, really appreciate it.
    Sounds like i will send the dealer a friendly email in October, but not get my hopes up till the new year.

    Chris

  8. #768
    Join Date
    Jan 2008
    Location
    Brisbane
    Posts
    3,553
    Quote Originally Posted by Dermot View Post
    It is NOT possible to get a VIN number until the car has actually been built.

    If you have a VIN number then your car has been built early. Having a "Planned Production Week" is exactly that, "Planned", and things don't always go according to plan. The car can be built earlier or late than the planned production week.
    Isn't the VIN available a week before the car enters production?

  9. #769
    Join Date
    Mar 2010
    Location
    Witness Protection
    Posts
    728
    Users Country Flag
    FWIW, I got my VIN / screen shots a week after the car had been built, and 5 weeks after I'd signed the contract. From there it took another 12 days before it actually hopped on a boat.

    I've got my car now, but for anybody waiting for theirs, instead of stressing about when it will arrive, enjoy the anticipation and soak it up. Psychological studies have proven that humans get the most enjoyment out of something like this not when they've actually got it, but in the anticipation prior and the reflection afterwards. Think about your last holiday, how much to you looked forward to it, and then how you feel about it now. Ok, that's enough philosophy for a goddamn car forum.
    --------------------------

  10. #770
    Join Date
    Feb 2009
    Location
    Sydney, Australia
    Posts
    8,362
    Users Country Flag

    I must admit, I've never heard anyone say that they got their VIN number before production until dave- said he got his for the Polo two weeks ago before it was built. However, as Dermot has said, "planned production" is still just an estimate and the car could be built before or after the "planned" production week. Also, judging by the fact that dave-'s sig says that the Polo is due here late Sept, my guess would be that the car has in fact been built already!

Page 77 of 238 FirstFirst ... 2767757677787987127177 ... LastLast

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
| |